Commissioning Project Highlights

Below are some highlights of our commissioned projects.  Please click here to see a complete list of projects.

King-Drew Medical Center

Health Care
Los Angeles County Department of Public Works

Los Angeles, CA

$270 million

420,000 square feet

New Construction and Major Renovation

LEED Silver

 King-Drew Medical Center

Scope of Work

Responsible for design review, field representation, authoring commissioning documents, including commissioning plan, pre-functional checklists, functional test plan, commissioning report, & systems manual, on-site observation, leading commissioning meetings, contractor submittal review, equipment checklists and observation of functional testing for the Los Angeles County Department of Public Works’ upgrade to the existing 38-acre Martin Luther King Jr. Medical Center Campus.  Commissioned systems included: mechanical equipment, direct digital controls, building enclosure, normal & emergency power, data infrastructure, audio/visual, nurse call, building enclosure, fire/life/safety, and domestic water.

Project Information

The project was constructed under a Design Build Methodology, which involved multiple buildings broken into two main projects to be constructed and coordinated simultaneously – the Hospital Renovation Project or Inpatient Tower Renovation Project, the new Multi-service Ambulatory Care Center, and several ancillary buildings.•In Patient Tower – Major renovation 187,676 sq. ft.
•Multi-service Ambulatory Care Center – New construction 130,000 sq. ft.
•Ancillary Building – Major renovation 22,000 sq. ft.
•North Support Building – Major renovation 52,276 sq. ft.
•South Support Building – Major renovation 34,762 sq. ft.
•Central Plant – New construction 24,103 sq. ft.
•Plant Management Building – Major renovation 15,648 sq. ft.

Civic Center

Public Sector
City of Temecula

Temecula, CA

$75 million

97,000 square feet

New Construction

LEED Gold

 Temecula Civic Center

Scope of Work

Responsible for design review, contractor submittal review, commissioning  document authoring, including commissioning plan, equipment lists, pre-functional checklists, functional test plan, & commissioning report, leading commissioning meetings, Issues Log tracking & updates, pre-functional & functional testing, on site observations, and operations & maintenance staff training.  Commissioned systems included mechanical equipment, direct digital controls, lighting controls, emergency power, and domestic hot water.

Project Information

Designed in Mission Revival style, the civic center fits into the town’s rustic image with archways, colonnades, plazas, a domed tower and a large, symbolic fountain.  The five-acre project consists of three main components: a 97,000-sq-ft, three-story city administration building, a four-level, 480-space parking structure with an 8,600-sq-ft store front, and a half-acre town square plaza.

The Collective at Playa Vista

Office
Tishman Speyer

Playa Vista, CA

$80 million

204,422 square feet

New Construction

LEED Gold

 The Collective

Scope of Work

Scope includes development of Owner’s Project Requirements, review of the Basis of Design, two design document reviews with back check, commissioning specification development, authoring of the commissioning plan, creation of the functional test plan, contactor submittal reviews, creation of pre-functional checklists, conducting commissioning team meetings, site observations and functional testing.  Commissioned systems included mechanical equipment, direct digital controls, lighting controls, and domestic hot water.

Project Information

The Collective at Playa Vista is a 204,422 square foot, five-building office campus located in the burgeoning Playa Vista submarket of West Los Angeles, slated for market delivery in the second quarter of 2015.  Each building features two floors with dramatic double height spaces of up to 21 feet. The concrete and wood exterior melds with interiors of steel columns, wood flooring and exposed roof framing to create an inviting yet industrial feel, complementing the landscaped grounds and private garden patios.

Hall of Justice

Public Center
Los Angeles County Department of Public Works

Los Angeles, CA

$231 million

500,000 square feet

Major Renovation and New Construction

LEED Silver

 HOJ

Scope of Work

I assisted in early site assessments & job walks, design phase reviews, and construction document authoring.  During the construction phase, I was responsible for site observations, pre-functional verification, scheduling assistance, contractor change order & billing review, functional testing, and performance verification.  Commissioned systems included new and existing mechanical systems, direct digital controls, parking garage ventilation, sewer and storm sump pumps, lighting controls, security/access control, emergency power, and data infrastructure.

Project Information

The Hall of Justice was renovated to provide space for the District Attorney’s office, Sheriff’s office, and other county agencies.  It was constructed in 1925 comprising approximately 500,000 gross square feet in 14 stories. This Repair and Reuse project scope of work includes structural demolition of the existing 11th  and 13th floors due to low ceiling heights leaving a 12 story building at completion. The project includes the retrofit of structural and non-structural elements to meet current seismic performance requirements and tenant improvements throughout the building. These included new building systems throughout the building and the construction of an adjacent multi-level 1,000 space parking structure. Preservation of historic materials and inclusion of an interpretive center museum are also included in the projects scope of work.

Los Angeles USD New Construction Projects

Education
Los Angeles Unified School District

Los Angeles, CA

New Construction

CHPS Designed

 LAUSD CRES 13

Scope of Work

I was the primary lead for all design, construction, and occupancy phase tasks, including; Owner’s Project Requirements development, Basis of Design validation, authoring commissioning plans, design review, Pre-Functional Checklist development, equipment list, Functional Test Plan authoring, contractor submittal review, construction operation, TAB verification, functional testing, warranty review, and lessons learned.  LAUSD is the second largest district in the country.  The District serves a student population of approximately 700,000.  Los Angeles Unified School District’s $20.3 billion school construction and renovation program is the largest program of its kind in the Western United States. I assisted with the development of CHPS standard documents/design specifications, District wide quality control program requirements, and commissioning program standards.

Project Information

135th Street ES $30.5 M 17,000 SF
Harbor City ES $30 M 13,500 SF
Southern Region HS #4 $110 M 272,106 SF
Central Region ES #21 $56 M 57,932 SF
Central Region ES #22 $44 M 56,865 SF LEED Silver
Central Region HS #13 $105 M 243,600 SF
Central Region HS #16 $171 M 201,693 SF LEED Silver
Valley Region ES #13 $58 M 71,753 SF

Anaheim Regional Transit Intermodal Center

Transportation
City of Anaheim

Anaheim, CA

$180 million

310,000 square feet

New Construction

LEED Platinum

 ARTIC_Main-Image

Scope of Work

Responsible for creation and execution of the Functional Test Plan and on site observation for both fundamental and enhanced LEED commissioning services for the new Anaheim Regional Transportation Intermodal Center (ARTIC).

Project Information

The center combines a transportation gateway and mixed-use activity center on 16-acre site owned by the Orange County Transportation Authority (OCTA) and the City of Anaheim. ARTIC will include a three level facility accommodating passenger arrivals, departures and transfers with supporting retail, restaurants and passenger services. The structure features a 180-foot archway offering expansive skyline views and will stand as a landmark throughout the region. The project is in pursuit of Platinum certification.

Port of Long Beach

Transportation
Port of Long Beach

Long Beach, CA

New Construction

LEED Gold

 Pier-G-03

Scope of Work

I served as a commissioning provider on numerous projects as part of the Port of Long Beach’s program.  My responsibilities included design review, site visits, equipment submittal reviews, functional and performance testing.  He is also involved in training and support after turnover including following up on warranty items, campus wide integration and continued training and education for both the owner and tenants.

Project Information

Harbor Plaza Development – Maintenance Facility $70M 124,313 SF
Pier G – Administration and Operations Facility $55M 248,000 SF
Pier G – Maintenance and Repair Buildings $65M 220,000 SF
Command and Control Center $21M 25,110 SF
Pier E Chassis Repair/Reefer Wash Buildings $11M
Pier E Power Crane & Marine Operations Center $15M
North Operations and IT Management & Building $12M 300,000 SF

Center for the Arts

Education
Bonita Unified School District

San Dimas, CA

$22 million

29,245 square foot

New Construction

CHPS Designed

 Rachlin Partners - Bonita Performing Arts Center - Photography by Tom Bonner - Job ID 6066

Scope of Work

I was responsible for design, equipment, and submittal reviews, document authoring, pre-functional & functional testing, on site observations and operations & maintenance staff training.    Commissioned systems included mechanical systems, direct digital controls, lighting controls, building envelope, and domestic hot water.  CHPS commissioning as well as acoustical verification were performed.

Project Information

This project is a new 29,245 SF Center for Performing Arts for the Bonita Unified School District located on the southwest side of the San Dimas High School campus. The center is a 709 seat variable acoustics auditorium including a pre-function lobby with restrooms, orchestra, parterre, and balcony level seating, a legitimate stage, stage apron, fly loft with loading galleries, grid iron, and counterweight rigging system. Catwalks, side lighting, control booth and follow spot booth are provided within the house. The project also includes a classroom sized multipurpose room.